Skip to content
APM
APM
  • Home
  • product
    • APM 7000
    • APM 5000
    • APM 3000
    • APM 2000
    • APM 1200
    • SENSORS
  • SERVICE
  • ELECTRIC SYSTEMS
    • PMS
    • SCADA
  • MAINTENANCE
  • ABOUT US
    • HISTORY
    • REFERENCE
  • CONTACT
  • Home
  • product
    • APM 7000
    • APM 5000
    • APM 3000
    • APM 2000
    • APM 1200
    • SENSORS
  • SERVICE
  • ELECTRIC SYSTEMS
    • PMS
    • SCADA
  • MAINTENANCE
  • ABOUT US
    • HISTORY
    • REFERENCE
  • CONTACT

New SEC project with L&T

APM has been contracted to supply On-line Partial Discharge Monitoring System (OPDMS) for the Construction of Al-Buhairah BSP with Larsen & Tourbro Saudi Arabia.

Category: PR CENTERBy apmtech10/06/2022

Author: apmtech

Post navigation

PreviousPrevious post:New SEC project with LinxonNextNext post:New SEC project with SIEMENS ENERGY

Related posts

Five SEC projects with L&T
06/12/2023
New SEC project with NESMA
06/12/2023
New OETC project with Hitachi
06/12/2023
Presentation at GCC POWER 2022 CONFERENCE
11/16/2022
New SEC projects with Al Gihaz
10/06/2022
New SEC project with Linxon
10/06/2022
RECENT COMMENTS
    • DOWNLOADS
    • PR CENTER
    • TERMS OR USE
    • PRIVACY STATEMENT
    Copyright ©2016 APM Technologles, Inc. All rights reserved.